From October 2 – October 16, 2024, the Corvallis Area Metropolitan Planning Organization (CAMPO) requests public input on amendments to the Federal Fiscal Year (FFY) 2024-27 Statewide Transportation Improvement Program (STIP). The following changes are proposed:

Amendment Key Project Name Project Change Requested Action Amendment Type
24-27-1961 23191 Loop Preventative Maintenance (CAMPO) FFY24 (5307) SLIP Slip Other phase to 2025. Adjustment
24-27-1960 23190 Loop Operations (CAMPO) FFY24 (5307) SLIP Slip Other phase to 2025. Adjustment
24-27-1959 22218 FY23 Loop Preventative Maintenance (CAMPO) SLIP Slip Other phase to 2025. Adjustment
24-27-1958 22217 FY23 Linn-Benton Loop Capital Project – set aside (CAMPO) SLIP Slip Other phase to 2025. Adjustment
24-27-1957 22214 FY22 Loop Preventative Maintenance (CAMPO) SLIP Slip Other phase to 2025. Adjustment
24-27-1956 22212 FY22 Linn-Benton Loop Capital Project – set aside (CAMPO) SLIP Slip Other phase to 2025. Adjustment
24-27-1955 20955 FY21 loop operations (CAMPO) SLIP Slip Other phase to 2025. Adjustment
24-27-1952 23673 CWCOG Transportation Options FFY24 – FFY27 SLIP Slip Other phase to 2025. Adjustment
24-27-1904 22511 OR34: Roadside Barrier Upgrades SINGLE PROJECT ADJUSTMENT Change start and end mile points. Incorrect MP’s were originally entered and no work has been done in the areas being removed. Current MP is 0.00 to 58.50. Changing to 2.33 to 54.53 Full
24-27-1927 22331 Purchase Equipment and Construct Bus Charging Facilities (Corvallis) SLIP Slip all phases from 2022 to 2023. The phases were obligated in TRAMS in 23 (OR2023-007) but for ODOT to show as obligated the phases need to be in 2023. Adjustment

Instructions for submitting public comment:

Please provide comments to Corum Ketchum via email at cketchum@ocwcog.org, or in writing to CAMPO; 1400 Queen Avenue SE, Suite 205; Albany, OR 97322. Comments can also be made by calling 541-223-7040.

The comment period will remain open until 5:00 PM (PST) October 16, 2024.

 

Additional materials:

Memo STIP Amendments_10.2.24